Steel News

We strive to let you one step ahead of the market.

ABB completes power reliability upgrade for InfraBuild’s electric arc furnace in Australia

16 Jan 2026 16:27 reported by Lewis Zhang

A A A
Global technology leading company ABB has completed a power system upgrade for the electric arc furnace at Australian steelmaker InfraBuild’s Laverton melt shop. 

The upgrade aims to improve power supply reliability and reduce maintenance risks. The project included installing two VD4-AF vacuum circuit breakers designed for electric arc furnace applications, replacing aging and hard-to-maintain equipment. 

InfraBuild emphasized that stable power is essential due to 40-minute melting cycles and frequent power switching. The new 2,500-amp system also supports higher future power input and long-term plant modernization.

Back to Steel News

Related News

Ternium boosts annual capacity by 2.6 million tons through expansion in Nuevo León plant

  • Industry Activities
  • 6 Nov 2026 14:12

CAA: Crude steel production in Argentina falls 4.7% in September due to weak demand and import pressure

  • Industry Activities
  • 6 Nov 2026 14:06

Egypt considers establishing dedicated agency for steel industry

  • Industry Activities
  • 6 Nov 2026 13:43

U. S. Steel begins construction on $1.9 billion direct reduced iron plant in Arkansas

  • Industry Activities
  • 5 Nov 2026 16:36

Taiwan’s steel grating industry expands into overseas markets to counter weak domestic demand

  • Industry Activities
  • 5 Nov 2026 16:36

Metal Price Index

Learn more

LME Official Bid Price

  • Zinc
  • 3,876.00
  • 3,840.00
  • Aluminum
  • 3,158.00
  • 3,097.00
  • Copper
  • 14,109.00
  • 14,025.00
  • Nickel
  • 16,080.00
  • 16,255.00

Learn more